View previous topic :: View next topic
|
Author |
Message |
PCP
Joined: 13 Oct 2012 Posts: 2005 Location: Manchester
|
|
Back to top |
|
 |
mattsurf
Joined: 28 Sep 2016 Posts: 852 Location: Zug, Switzerland
|
Posted: Wed Sep 19, 2018 7:12 pm Post subject: Re: iQ2 power meter |
|
|
PCP wrote: | https://www.kickstarter.com/projects/1468298434/cycling-power-meter-at-a-breakthrough-price
https://www.dcrainmaker.com/2018/04/iq2-149eur-first-power-meter.html
I've just backed this at £250 for dual sided.
Finally released some power numbers, albeit not exactly detailed but seems to run consistently compared to Stages & Powertap of fist sight.
Will sell my Quarq 53/39 to get my Sram Red 52/36 back on that came with my bike.
Hopefully it works and I'll be happier on the hills!
Has anyone else seen or backed this? |
Yes... and if it works will sell my Stages
I looked into this a bit and think that this has a real chance to be the game changer in power meters. I suspect that at the begining the software will be buggy and clunky, however, with the funding that they have received this had a real chance
Risk is that one of the big players, Quark, Garmin, SRM etc will buy the company to kill it it does work as described
|
|
Back to top |
|
 |
PCP
Joined: 13 Oct 2012 Posts: 2005 Location: Manchester
|
Posted: Wed Sep 19, 2018 7:16 pm Post subject: |
|
|
They reckon November delivery so I’ll be the guinea pig.
I’ll run it alongside my Quarq to start with to compare.
I don’t care TOO much if it runs higher or lower, as long as it is consistent.
|
|
Back to top |
|
 |
Jorgan
Joined: 12 Nov 2007 Posts: 18226 Location: alles was ich bin, alles was ich war
|
Posted: Thu Sep 20, 2018 8:18 am Post subject: |
|
|
I did see it, but earlier in the year it looked a bit of a risk, so I just got the Assioma Duo instead - which will be slightly less of a faff to move between bikes tbh, and won't add a lot to the Q-Factor like the IQ.
Having seem the tales of woe with Stages in the early years, I'd rather go with something established and no widely reported gremlins. Hence why I avoided Vector 2/3 too!
_________________ 27 Years since it all began....
|
|
Back to top |
|
 |
iwaters
Joined: 06 Sep 2016 Posts: 448
|
Posted: Thu Sep 20, 2018 8:31 am Post subject: |
|
|
They seem to be claiming the cheapest and most accurate (1%) PM going? Most others I have seen claim a 1.5-2.5% accuracy.
Slowtwitchers will be crying about the offset on their q factor
|
|
Back to top |
|
 |
PCP
Joined: 13 Oct 2012 Posts: 2005 Location: Manchester
|
Posted: Thu Sep 20, 2018 8:38 am Post subject: |
|
|
iwaters wrote: | They seem to be claiming the cheapest and most accurate (1%) PM going? Most others I have seen claim a 1.5-2.5% accuracy.
Slowtwitchers will be crying about the offset on their q factor  |
Lots of people questioning the Q factor but I ride a TT bike, road bike & MTB so they will be different anyway. A winter on the turbo will get me used to it.
I'm not a hugely strong biker but my form is fairly good, hopefully the extra 1.6cm doesn't send my knees all 'Sanders'
|
|
Back to top |
|
 |
JaRok2300
Joined: 01 May 2014 Posts: 461 Location: Worcester, UK
|
Posted: Thu Sep 20, 2018 11:45 am Post subject: |
|
|
Slowtwitchers will be crying about the offset on their q factor [/quote]
I'm sure one of them is rummaging through their trigonometry text books as we speak, to work out how much they're going to have to lower their seat height because of it.
|
|
Back to top |
|
 |
PCP
Joined: 13 Oct 2012 Posts: 2005 Location: Manchester
|
Posted: Fri Nov 23, 2018 12:43 pm Post subject: |
|
|
Latest update - Power readings ok, delivery time put back.
Data Collection & Production Practicalities
Hi everyone,
We promised you an extensive data update last week, but we'll need an extra week.
Collecting Data
Co-founder Woud Vleugel, both triathlete and electrical engineer, has been going out on almost a daily basis cycling with multiple finished-product power meters and a backpack filled with electronics. Simultaneously, another independent party has been performing some final calibration tests in lab conditions, such as calibrating applied force and nullifying temperature, humidity & torque effects on the threads. We can't wait to share the outcomes, but are still working on the report.
We’re still extremely excited about the test results! Below is a new picture of the data of a short bike ride, comparable to an earlier update. This time, as many of you requested it, we added a link (please click) to the DC Rainmaker analyzing tool, where you can find and access this graph in high resolution and more detail.
iQsquare’s power meter (purple) compared to Power Tap (blue) and Stages (orange). Like an earlier update, our graph still falls neatly between other power meter outcomes and has performed consistently.
Tying Production Together
Now, as all production, testing and practical usage processes are starting to come together… we do have another important topic to discuss: we’re going to need a little bit more time to deliver the first power meters. We’d like to share with you the main reason below and hope you understand, as your support is a huge motivating factor for us.
As you know, iQsquare is creating a one of a kind, mass-produced product. It’s one of the most rewarding and challenging journeys our team has ever been on! We work together with almost 20 manufacturers and our timeline was pretty tight from the beginning. Our collective dream had to start somewhere, right? As we are getting really close to our final product and the delivery date, a few of our production partners have been encountering some practical obstacles in the manufacturing process.
One example of this is the placement of a component of the printed circuit board. It’s been recommended that we move it to another location on the board as to have a better fit with the low-pressure molding technique. In short, moving the component provides the best way to guarantee a dust free and waterproof power meter. Obviously, that’s a quality we’re looking for.
First Half of January
So, yes. The good news is that we have a power meter that is showing accurate results; we’ll update you on that in more detail next week. The bad news is that tying together all separate processes isn’t only exact science, but sometimes a bit of an art. We’re putting in the work and are excited about seeing it all come together, but we have to admit it’s a bit of a tough pill to swallow when you’re this close to delivery.
Anyway, we expect the delay to be about three weeks. Taking Christmas and New Year holidays into account, with factories closed, we estimate to have the power meters ready during the first half of January.
It’s not fun to accept that sometimes these setbacks come with startup territory, no matter how hard we want to cross that finish line! Send us your comments, concerns, support…. anything you like. We love hearing from you and it keeps us involved in your thought process as well, which is very important to us.
Kind regards,
Team iQsquare
|
|
Back to top |
|
 |
mattsurf
Joined: 28 Sep 2016 Posts: 852 Location: Zug, Switzerland
|
Posted: Fri Nov 23, 2018 1:50 pm Post subject: |
|
|
Having run manufacturing operations in the past, I believe that the issues IQ Squared had with the supplier of its titanium parts, made their aspiration to start shipping at the end of November completely unrealistic.
Now they have a minor redesign to move a component.... a really switched on and experienced supply chain team could probable sort this is 3 weeks, however, I probably wouldn´t hold my breath. March would probably be a pretty aggressive timeline
|
|
Back to top |
|
 |
PCP
Joined: 13 Oct 2012 Posts: 2005 Location: Manchester
|
Posted: Fri Nov 23, 2018 3:06 pm Post subject: |
|
|
mattsurf wrote: | Having run manufacturing operations in the past, I believe that the issues IQ Squared had with the supplier of its titanium parts, made their aspiration to start shipping at the end of November completely unrealistic.
Now they have a minor redesign to move a component.... a really switched on and experienced supply chain team could probable sort this is 3 weeks, however, I probably wouldn´t hold my breath. March would probably be a pretty aggressive timeline |
Probably. They've said early Jan, I expect mid-late Feb. No rush, I've got my Quarq, although I was hoping to run them together for a couple of months and then get rid of the Quarq in Feb/March.
As long as they are reliable and I've got my 52/38 crank on for when my TT comes off the turbo in March/April. It will be good to throw them on my road bike for Mallorca 312 also.
|
|
Back to top |
|
 |
Jorgan
Joined: 12 Nov 2007 Posts: 18226 Location: alles was ich bin, alles was ich war
|
Posted: Wed Mar 06, 2019 3:54 pm Post subject: |
|
|
Are these things still vapourware?
_________________ 27 Years since it all began....
|
|
Back to top |
|
 |
mattsurf
Joined: 28 Sep 2016 Posts: 852 Location: Zug, Switzerland
|
Posted: Wed Mar 06, 2019 9:23 pm Post subject: |
|
|
Jorgan wrote: | Are these things still vapourware? |
yes, although I believe that the first batch is ready to ship to "key influencers" ie DC Rainmaker.
My prediction made a couple of months ago seems a little optimistic. I am now thinking May
|
|
Back to top |
|
 |
mattsurf
Joined: 28 Sep 2016 Posts: 852 Location: Zug, Switzerland
|
Posted: Fri Mar 08, 2019 4:38 pm Post subject: |
|
|
Just received a mail that they have discovered a hardware issue in testing. I am guessing a significant delay
|
|
Back to top |
|
 |
Tri'ing Swimmer
Joined: 15 Nov 2016 Posts: 219
|
Posted: Sun Mar 10, 2019 12:08 pm Post subject: |
|
|
Considering a PM as really enjoy indoor training on the wattbike and would Ben nice to be consistent. Would be looking for a budget option but having doubts this will arrive, certainly not for this season.
|
|
Back to top |
|
 |
mattsurf
Joined: 28 Sep 2016 Posts: 852 Location: Zug, Switzerland
|
Posted: Mon Mar 11, 2019 6:42 am Post subject: |
|
|
All the problems that they are seeing are pretty normal for a new product introduction: just look at the issues that Garmin have every time they launch a new product
As a supply chain professional, launches are always the most difficult to plan properly. It is clear that the team are great engineers and have some idea about marketing and sales, however, when it comes to supply chain, they have a lot to learn.
However, I still have faith that they will get there, just not sure when
|
|